Types of letters we issue.
We routinely issue letters for the following, plus Alternate Means and Methods (AMMR) requests and jurisdiction-specific clarifications when needed:
The codes involved.
Florida roofing work is governed by the Florida Building Code (FBC) as enforced by the local Authority Having Jurisdiction (AHJ). The 8th Edition (2023) is in effect through December 30, 2026, and the 9th Edition (2026) is scheduled to take effect on December 31, 2026. The edition is tied to the permit, so confirm it with the building department.
Our letters cite the sections that apply to the job. Depending on the scope, that can include the FBC Existing Building and Building volumes, the FBC Residential volume, ASCE 7 wind loads, product approvals, and manufacturer installation requirements. In the High-Velocity Hurricane Zone (Miami-Dade and Broward) the stricter wind and roofing requirements apply and roofing products are approved by NOA.
For some single-family homes, Florida law adds items to a roof replacement. Under s. 553.844(3), Florida Statutes, a roof replacement on a site-built, single-family residential structure must incorporate the secondary water barrier and roof-deck attachment techniques the statute describes. In the wind-borne debris region, when the building has an insured value (or, if uninsured, a tax-assessed just valuation) of $300,000 or more, it must also incorporate the roof-to-wall connection techniques. Whether those items apply to your job depends on the building, so the letter states the basis.
Re-roofs and the 25% rule.
Section 706.1.1 of the FBC Existing Building limits repair, replacement or recovering of a roof section to 25 percent in any 12-month period, unless the entire roofing system or roof section is brought up to the requirements for new roofing. The Florida Building Commission’s analysis of changes for the 8th Edition notes that Section 706.1.1 was revised so that, once the 25 percent rule is triggered, it applies to both roof replacement and roof recover.
Florida changed how this works for newer roofs. Under s. 553.844(5), Florida Statutes, as last amended in 2022, if a roofing system or roof section was built, repaired or replaced under the 2007 Florida Building Code or a later edition, and 25 percent or more of it is repaired, replaced or recovered, only the portion being repaired, replaced or recovered has to meet the code in effect at the time. A local government cannot amend this exception by ordinance.
That makes the roof’s history part of the answer. A code letter for a re-roof typically states:
- the roof area or section being repaired, replaced or recovered
- when the existing roof was built, repaired or replaced, and under which code edition, as shown by permit records
- which pathway applies and which sections of the code it rests on
- any conditions the reviewer should attach to approval
If a roof is damaged, the question often comes up in a claim too. See how it works in insurance letters.
How it works.
Submit
Send the project address, scope, plans/photos, and any AHJ comments or reviewer notes.
Review
We evaluate loads, details, and the governing code path, and request only essential clarifications.
Deliver
You receive a stamped PDF engineered to withstand plan-review scrutiny. Wet-signed originals are available on request.
Addenda
If the reviewer responds with follow-up questions, we provide addenda to close the loop.
What's included.
Every letter is signed and sealed by a licensed Professional Engineer and written to satisfy AHJ needs.
- A concise narrative of conditions
- Applicable code citations, including local amendments where relevant
- The selected code pathway or equivalency basis
- Supporting checks or calculations as appropriate
- A clear conclusion with any required conditions of approval
Problems a letter solves.
These are the situations that send contractors to us most often.
Redlines? We close them.
You’ll typically need a code compliance letter when an Authority Having Jurisdiction (AHJ) requests clarification, a plan reviewer leaves redlines, you’re proposing an alternate method/material, you’re documenting equivalency for an assembly, or you need to confirm “no structural change” for a re-roof, repair, or recover.
Code letter FAQs.
It is a stamped letter from a licensed Professional Engineer that states which code pathway a roofing project uses and why the work meets it. Plan reviewers and building officials use it to close redlines and clear inspections. It does not replace the permit or the inspections the AHJ requires.
Section 706.1.1 of the Florida Building Code, Existing Building, limits repair, replacement or recovering of a roof section to 25 percent in any 12-month period, unless the whole roofing system or roof section is brought up to the requirements for new roofing. Section 553.844(5), Florida Statutes, makes an exception for roofs built, repaired or replaced under the 2007 Florida Building Code or later: only the portion being worked on has to meet the code in effect.
The 8th Edition (2023) is in effect through December 30, 2026. The 9th Edition (2026) is scheduled to take effect on December 31, 2026. The edition that applies is tied to the permit, so confirm the date and edition with the building department before the letter is written.
Yes. Miami-Dade and Broward make up Florida's High-Velocity Hurricane Zone (HVHZ), which has stricter wind and roofing requirements and uses NOA product approvals. Tell us the county and the product approval numbers when you request, and the letter will cite the pathway that applies there.
Yes. We work in all 50 states. Florida is where we have the most experience. Send the project address and the reviewer's comments and we confirm coverage and the governing code when we respond.
Timing depends on the project and the documents you send; we confirm it when we scope the job. We need the scope, the plans or photos and any reviewer comments. Tell us the date when you request.
The AHJ decides what it accepts, and we cannot promise an outcome. Every letter is stamped by a licensed engineer and written to answer the reviewer's specific comment. If the reviewer comes back with more questions, we provide addenda.
A code compliance letter answers a question about a roof that is designed or built. A plan set is the drawings. If the job needs framing details, uplift fastening schedules or edge metal details, see our plan creation service.